Finspångs Tekniska Verk has expanded the capacity of its pre-treatment application at the Axsäters wastewater treatment plant to live up to the current flow requirements.
The new application is able to handle 2000 m3/h. Hydria Water has partnered up with Aquasvea and supplied two step screens, two screw presses, and two shredders with the accompanying control cabinets. When installing the new pre- treatment application, Hydria Water’s mobile container solution was used to carry out operations temporarily. Hydria Water was also responsible for assembly, deployment, and training of the delivered equipment.